What is the production lead time for an order?
Standard production lead time is 15–30 days after receipt of deposit and confirmation, depending on batch size and current harvest stock; custom packing or certifications add 5–10 days.
Lead Time Breakdown
| Stage | Typical time |
|---|---|
| Order confirmation & deposit | 1–3 days |
| Production / allocation | 7–20 days (depends on batch size and stock) |
| QC release & documentation | 2–5 days |
| Custom packing / certification | +5–10 days if required |
| Total (standard) | 15–30 days |
- Batches in stock ship fastest; harvest-linked production runs follow the spring blossom schedule
- For urgent needs, existing stock can be prioritized with your confirmation
- Contract volumes can be produced and reserved ahead of the season to secure supply
Confirm your quantity and deadline, and we will lock a delivery schedule in the PI.
บทความนี้เผยแพร่เมื่อ 2026-09-07 และอัปเดตล่าสุดเมื่อ 2026-09-07 โดยจะมีการปรับปรุงเนื้อหาอย่างต่อเนื่อง