What is the production lead time?
Standard lead time is 15–30 days from deposit confirmation, depending on batch size and packaging. In-season stock lots can ship faster; custom packaging adds 5–10 days.
Lead Time by Order
| Order type | Lead time |
|---|---|
| In-stock standard | 7–15 days |
| Standard production | 15–30 days |
| Custom packaging / private label | 25–40 days |
| Organic-certified lot | Per season allocation, confirm at order |
Give us your volume, packaging and target date and we will confirm a binding lead time in the PI.
บทความนี้เผยแพร่เมื่อ 2026-09-07 และอัปเดตล่าสุดเมื่อ 2026-09-07 โดยจะมีการปรับปรุงเนื้อหาอย่างต่อเนื่อง